Home » SEVENLOG TRANSFORMER PROJECT TO BURKINA FASO

SEVENLOG TRANSFORMER PROJECT TO BURKINA FASO

[et_pb_section fb_built=”1″ _builder_version=”4.18.0″ _module_preset=”default” hover_enabled=”0″ global_colors_info=”{}” custom_margin=”0px||0px||true|false” custom_padding=”0px||0px||true|false” sticky_enabled=”0″][et_pb_row _builder_version=”4.18.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.18.0″ _module_preset=”default” global_colors_info=”{}”][et_pb_text _builder_version=”4.18.0″ _module_preset=”default” hover_enabled=”0″ global_colors_info=”{}” sticky_enabled=”0″ text_font_size=”16px”]

In March 2020 Sevenlog was appointed by Fracht France https://www.fracht.com/en/index.php as the local agent to undertake a colossal project to help Burkina Faso increase its electricity supply.  In order for the country to reach its national economic development target of increasing electricity access from 20% to 80% by 2021, an upgrade of the Kossodo thermal power plant project was necessary. Alongside Mammoet https://www.mammoet.com/ who undertook the heavy lifting, Sevenlog’s scope was to handle the haulage and customs clearance of all machinery and equipment via the port of Takoradi.

Sevenlog oversaw the successful land transportation of equipment across 1400km of sometimes difficult terrain, potholed roads, structurally unstable bridges and low-hanging power lines, along the Ghanaian corridor. Rarely had cargo of this size been transported over such a long distance and under such fraught conditions such as the poor infrastructure and the restrictions of Covid 19. The project almost came to a halt when the lockdown resulted in border closures with Ghana, meaning that key technical experts from South Africa were unable to obtain the necessary travel documents to see the project to completion. However, thanks to Sevenlog’s efficiency and extensive networks across various sectors, the company succeeded in record time to obtain all the necessary permits for the technicians as well as for the vehicles transporting the equipment across the border. Overcoming these challenges has only further served to consolidate Sevenlog’s status as the leading logistics agency in Ghana and in West Africa. If it were not for Sevenlog’s timely intervention the project would have been stalled until the end of the Covid crisis.

[/et_pb_text][/et_pb_column][/et_pb_row][/et_pb_section]
Tag:

Recent News

APM Terminals advances Tema Port capacity towards 3mn TEUs
PROJECT FOR 50MW POWER PLANT IN BURKINA FASO
SEVENLOG DONATES GOLF EQUIPMENT TO THE TEMA GOLF CLUB
SEVENLOG POWER PLANT PROJECT TO BURKINA FASO

Recent News

© 2026 SevenLog - All Rights Reserved.
Office Contacts
Ghana
  • 4th Floor Ocean Heights Building, near Tema Harbour Roundabout, Tema Community 1, Ghana
  • +233 303 211 860
  • info@seven-log.com
Togo
  • Port Zone, Grands Moulins Street, CCI-BF Building, Lomé, Togo
  • +228 71 01 89 11
  • info@seven-log.com
Côte d’Ivoire
  • 2nd floor, La Balance Building, Solibra Intersection, F. Houphouët Boigny Blvd, Treichville, Abidjan
  • +225 27 21 35 1938
  • info-ci@seven-log.com